The idea of building the world's most advanced speedway stadium was born in 2003. It took only six years to complete.
The Motoarena Toruń can accommodate 15,000 seated spectators, to watch the riders compete on a 318-metres long track.
A critical part of the venue's structure was the canopy roofing system, which shelters the speedway spectators from rain.
The canopy was covered with the Balex Metal BTD50 curtain box profile sheet system. Now 10 years after its installation, the box profile sheet roofing is still in great shape.
The canopy is sturdy and still requires no repair.
The project was completed with the following materials from Balex Metal:
- BTD 50 curtain box profile sheet - canopy over the stands